IFSM 300 IFSM300 WEEK 5 QUIZ RESULTS (2020) - UMUC

 IFSM 300 IFSM300 WEEK 5 QUIZ RESULTS (2020) - UMUC

 

 

 

DOWNLOAD HERE

https://studentoffortunefix.com/collections/papers/products/ifsm-300-ifsm300-week-5-quiz-results-2020-umuc

 

UMUC IFSM 300 Week 5 Quiz Results (2020)

During which phase of the SDLC is user acceptance testing performed?

Design phase

Study phase

Operations phase

Testing phase

 

Question 2​​1 / 1 point

During which phase of the SDLC is the database layout specified?

Design

Study

Development

Operations

 

Question 3​​1 / 1 point

True or false:  Placing IT responsibilities with the managers responsible for conducting the business leads to the most efficient use of IT.

​True

​False

 

Question 4​​1 / 1 point

Which of the following are well-written requirements?  (select all that apply)

The system should tell the user what they did wrong.

The system must calculate the total of the sale.

Users can log in and see their information.

When a user logs in, the system must present that user's recent account activity.

 

Question 5​​1 / 1 point

Which of the following is not a well-written requirement statement? 

The system must be available 24 hours a day, 7 days a week.

The system must be able to be accessed using  the following browsers:  Internet Explorer, Mozilla Firefox, Safari, and Google Chrome.

The system must be intuitive to the user.

The system must encrypt the data stored in the data base.

 

Question 6​​1 / 1 point

Which of the following are true statements regarding the benefits of outsourcing IT?  (select all that apply)

The organization does not have to invest in any additional hardware

Outsourcing allows the organization to focus on its core competencies

Outsourcing can provide cost savings to the organization

Vendor IT personnel may provide a higher level of security than in-house IT personnel

 

Question 7​​1 / 1 point

Which of the following apply to the systems development life cycle (SDLC) methodology?  (select all that apply)

SDLC was developed for large, structured projects

Projects using SDLC can sometimes take months or years to complete

SDLC can be rigid/inflexible

SDLC is sometimes called "The Step-wise Methodology," since one step must be completed before moving to the next step

 

Question 8​​1 / 1 point

Which of the following are true of the Rapid Application Development (RAD) methodology?  (select all that apply)

RAD is more compressed than SDLC

RAD allows users to provide feedback throughout the process

RAD skips many of the steps in the SDLC

RAD is best suited to smaller projects

 

Question 9​​1 / 1 point

Match the following requirements statements with the appropriate system quality attribute.

 

1. Availability

2. Interoperability

3. Scalability

4. Usability

5. Portability

 

Question 10​​1 / 1 point

Which of the SDLC models has distinct goals for each phase of the development and requires each phase to be fully completed before the next phase can begin? 

Fountain model

Rapid prototyping model

Build and fix model

Waterfall model

 

Question 11​​1 / 1 point

During which phase of the SDLC are the specific requirements identified?

Systems analysis

Design

Development

Operations

 

Question 12​​1 / 1 point

Match the following requirements statements to the type of requirement they represent.

 

1. The system must automatically fill in the State field after the user enters the zip code.

2. The system must be accessible from a smartphone.

3. The system must allow only the "administrator role" to add new users to the system.

4. The system must create a list of new customers added during the week.

 

Question 13​​1 / 1 point

Which development methodology utilizes incremental changes with a focus on quality and attention to detail?

Rapid prototyping

SDLC

Rapid application design (RAD)

Agile

 

Question 14​​1 / 1 point

Which of the following are true statements about the risks associated with buying or outsourcing IT?  (select all that apply)

The system may not meet some requirements

The system may require changes to the business process that are unacceptable to the user

The cost of switching vendors may be high

The vendor may go out of business

 

Question 15​​1 / 1 point

Which of the following is the group of users that are the first individuals to adopt a new technology?

Innovators

First adopters

Early majority

Early adopters

 

Comments